Driving Hydrogen Integration in Heavy Industry with KanBo

KanBo enables full-spectrum coordination of hydrogen innovation, from laboratory breakthroughs to large-scale industrial deployment.

I. Strategic Structuring by Domain

  • Workspaces: Dedicated to core pillars like R&D, Production, Policy, and Infrastructure.
  • Spaces: Focused on sub-initiatives, such as membrane optimization or pilot trials in steelmaking.
  • Card Templates: Standardized task structures used across all project types.

II. Task Management & Dependency Mapping

  • Cards: Represent individual milestones—prototype builds, emissions analysis, regulatory filings.
  • Card Relations: Visualize task dependencies, such as test validation → mass production approval.
  • Statistics & Status Flags: Provide real-time performance visibility.

III. Visual Planning Tools

  • Gantt Charts & Calendar Views: Timeline tracking for electrolysis rollout and site construction.
  • Forecast Charts: Predict delivery risks using historical task data.
  • Bottleneck Detection: Delays and blockers flagged based on resource usage or task lags.

IV. Cross-Functional Resource Management

  • Workload Balancing: Resource Manager detects conflicts (e.g., overbooked teams, critical machinery).
  • Role-Based Allocation: Assigns staff based on skills, availability, and compliance needs.
  • Supply Chain Monitoring: Tracks vendor task statuses and lead times within shared Cards.

V. Collaboration & Communication

  • KanBo Comments & Mentions: Enable threaded, traceable communication.
  • Live Document Sharing: Technical files, test results, and certifications stored in Cards.
  • MS Teams & SharePoint Integration: Ensures seamless internal and external collaboration.

VI. Compliance & Reporting Oversight

  • Regulatory Spaces: Track permits, sustainability metrics, and documentation updates.
  • Audit Readiness: Historical records and card activities fulfill compliance needs.
  • Sustainability Analysts: Use dashboards to visualize progress toward emissions targets.

Month 1 – Planning and Setup

Months 2-6 – Pilot Phase

Month 7 – Pilot Evaluation

Months 8-18 – Full Rollout